No: HP/P-III/RJCM dated at Una the 02.09.2013
Shri M Krishanan
General Secretary,
AIPEU Group “C” CHQ
New Delhi-08
Sub: Non-repair of UPS installed in various
Post Offices in HP Circle due to non-allotment of adequate funds by the Directorate.
Respected Sir,
In HP Circle, the
UPS installed in Head Post Offices and in Double Handed Post Offices of the
Uniline Company being substandard are out of order from the day of installation
and even after carrying out minor/needy repair; these are not in working
condition. The entire work of the office is stopped during the frequent power
cuts/power failure. You can well imagine the plight of staff. Since the UPSs
are not functioning, the power supply to the computer network of the office is
made directly from the main supply line of the electricity boards.
This issue has been
taken up with the circle administration many times.
However, the CPMG
Shimla vide letter No Tech/2-8/10 dated 07.06.13 has informed to this union
that Rs 70 Lacs have been requisitioned as additional funds from the
directorate for this purpose. Till date, no funds have been allotted by the
Directorate. It reflects the seriousness of the authorities concerned on the
functioning of computerization and various schemes in the Department of Posts.
You are therefore,
requested kindly take up with the Directorate for immediate allotment of funds
to the HP Circle. (Copy of CPMG letter ibid and circle union letter No
HP/P-III/RJCM/Meeting dated 22.05.13 addressed to CPMG is enclosed as Annexure
A and Annexure B as ready reference)
With regards.
Yours brotherly,
[H S Guleria]
Circle Secretary